top of page

Pre-Inspection Checklist

Preparing for an RV inspection is necessary to ensure a smooth, thorough inspection.  To help you prepare, we have created a Pre-Inspection document with everything you need to know before your inspector arrives.  This ensures all systems are ready to be looked at, as well as providing adequate space and powering up essential systems.  If these steps are followed, it will allow the inspection to proceed as quickly as possible.

Our inspections begin at 9:00 AM and take a minimum of five hours, so please make sure the unit is ready to go the night before to enhance the process so you can receive your report the same day.

 

NOTE:  Inspections CANNOT be completed while repairs are being made, the RV is being detailed, or times walk-throughs are scheduled.

 

Space Required

To extend and retract all slideout rooms and awnings.

To safely move a ladder around the RV.

​​

RV Refrigerator

RV type refrigerators must be on at least 12 hours prior to the inspection

​​

RV Propane

Tanks must be at least ½ full

​​

Fuel to Test Generator

RV Fuel must be at least ½ Full

​​

RV Hookups

Shore power supply.  50A or 30A (110 V house supply is not recommended)

City water connection.  If not available, the freshwater tank must be full

Dewinterization must be performed prior to inspection time.

Wastewater/ sewer hookups—preferred but not required.

​​

RV Keys and Personal Contents

Most personal content should be removed or neatly stacked so inspection can occur.

Keys to all areas must be available (Entrance Doors, Cargo Bays, Fuel Doors, and ignition).

Wheel covers must be removed.

The windshield cover must be removed.

All electronic remotes should be together on the counter.

bottom of page